Alliant Energy – Whispering Willow Wind Farm

³Ô¹Ï±¬ÁÏ was the erection subcontractor for the foundations, 21 Vestas V 82, 1.65 MW turbines and towers. As the erection subcontractor to RMT, we provided the labor, project supervision and four cranes needed for tower erection, attaching blades and nacelle and rotor installation.
³Ô¹Ï±¬ÁÏ coordinated the daily delivery of the turbines to the site (scheduling, site locations and interfacing with the turbine component trucking company). ³Ô¹Ï±¬ÁÏ was also responsible for the inspection and off-loading of all turbine components, which included the four turbine tower sections, hub, three blades, nacelle and VPM.
Client
Alliant Energy
Location
Franklin, Iowa
Franklin, Iowa
Architect/Engineer
RMT
³Ô¹Ï±¬ÁÏ Role
Self-perform Construction
Self-perform Construction
Project Type
New Construction
New Construction
Project Size
35MW
35MW
MARKET
Renewable Energy
Project Highlights
- ³Ô¹Ï±¬ÁÏ worked with local road commissioners to coordinate county road usage and road crossings.
- ³Ô¹Ï±¬ÁÏ coordinated with the local utility (Franklin County REC) to manage electrical line drops for crane movement between sites.
- This project was completed within budget and 14 days ahead of schedule.